Metal Bridge
Benguela, Benguela, Angola
Equipment and Infrastructures
Resting on ashlar pillars over the Cavaco River, it was built in 1886-1887. Used by the Benguela Railway, the bridge is structured on six main columns which support the successive straight metal structures.